To begin with, the Jai Hind metro station was prepared being elevated. On the other hand, the AAI objected the elevated stretch up into the airport could possibly pose a risk to aircraft, so the route was even further reworked plus the station was shifted underground, one hundred fifty m from https://railwayrecruitment54223.ageeksblog.com/31314157/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf